Project

Refurbishment of The Conference Centre - Hastings

Project Manager

Value

£617,111

Architect

Client

The Conference Centre

Duration

Sector

Commercial

Download Case Study

Description of Works

Complete refurbishment of the Hastings Centre, a high quality conference centre on behalf of the Hastings Community Trust. The existing building was constructed in the early 1990’s but refurbishment work was necessary to form a new entrance and vestibule with reception.

Other facilities that the refurbishment has provided in this spacious and functional interior include a coffee bar area and servery, offices, toilets, a multi-purpose room, a new first floor office area and staircase. The building now benefits from new Aluminium windows and external doors, as well as large patio and landscaping.

All of the facilities are DDA compliant, ensuring that there is access for the disabled to entrances and internal rooms and to a newly fitted disabled toilet. Fire doors were installed and the building will benefit from heating by cassettes powered from a heat pump.

We carried out the works whilst the building remained in continual use and dealt expertly with the challenges that this can bring.

Talk to us about your construction project

Whether you are planning a project, interested in getting involved with us, or enquiring about a job opportunity, please don’t hesitate to get in touch.

Contact us

01293 531977

info@vulcanellis.co.uk